2016
Reconditioning the roof Charter
Change the roof plus wooden floor slab.
Date started: April 2016
Date of completion: April 2016
Project Manager: Ing. Dan Munteanu
Interior and exterior design Federalcoop
Interior and exterior design
Start date: march 2016
The date of completion: April 2016
Project Manager: Ing. Dan Munteanu
Pavements Marsa- Bld. Coposu
Pavements Bld. Coposu, Marsa, Jud. Sibiu
Start date: march 2016
Project Manager: Ing. Dan Munteanu
The Embankment Avrig
The embankment sides bad with pavers type grid
Start date: march 2016
Project Manager: Ing. Dan Munteanu
Pavements Avrig Area Glass
Fix alleys between blocks, The Area Of The Bottle, Avrig
Project Manager: Ing. Dan Munteanu
The house at the Red Veseud
Building house S+P+M village of Veseud, comuna Slimnic - built area: 117 mp.
Project Manager: Ing. Dan Munteanu
2015
Fitting road and parking, Avrig
Fix the road and parking area Bottle, Avrig: mounting pavers, curbs precast and lifting to share channels. Project in collaboration with the city Hall of Avrig. The surface: 2010 mp.
Term of execution: 2 months.
Project Manager: Ing. Dan Munteanu
Works of paving the Central area, Avrig
Repairs to the alleys between the blocks for Area Bottle, the town of Avrig. Project in clolaborare with the Town Hall of Avrig. The surface: 880 mp.
Term of execution: 3 weeks.
Project Manager: Ing. Dan Munteanu
Repair Driveway Carnations, Marsa
Repair Driveway Carnations, Marsa, Jud. Sibiu. Project in collaboration with the city Hall of Avrig. The surface: 397 mp.
Term of execution: 2 weeks.
Project Manager: Ing. Dan Munteanu
Repairs to the alleys between the blocks for Area Bottle
Works of paving the parking lot in between the blocks 19 and 20 in the Central Area of the city of Avrig - 750 mp paving
Term of execution: 1 month
Project Manager: Ing. Dan Munteanu
Construction duplex in red, Sura Mare
Construction duplex in red, place. Sura Mare.
Term of execution: 2 months
Project Manager: Ing. Dan Munteanu
Reconditioning the house of the Charter
Building the house of the Charter:
Term of execution: 1 month
Project Manager: Ing. Dan Munteanu
Personal home, Cisnadie
Building single-family house - P+E, built area: 232 mp.
The period of execution: 2 months
Project Manager: Ing. Dan Munteanu
Workshop Turnu Rosu
Hall on metallic structure with locking panels and joinery made of PVC. The surface: 120 mp.
Term of execution: 2 months.
Project Manager: Ing. Dan Munteanu
Hall Cristian, Sibiu
Hall on metallic structure with locking panels and joinery made of PVC. The surface: 400 mp.
Term of execution: 3 months.
Project Manager: Ing. Dan Munteanu
Personal home, Krefeld Germany
Personal home Krefeld, Germany, 280 mp.
Term of execution: 5 months
Project Manager: Ing. Dan Munteanu
Remodeling the house, Pipera Bucharest
Redevelopment: thermal, interior finishes, terrace, works of underlay.
Project coordinator: Ing. Moronescu Marian
Landscaping offices
Disassembled interior doors, achievement goals in the masonry, closing gaps with masonry/ plasterboard, mapped out the trenches for the electrical installation, traced the grooves and mounted the high thermal installation, gletuit interior walls, painted interior.
Project coordinator: Ing. Moronescu Marian
2014 - 2013
Center harvest Synevo
Interior design center harvest Synevo
Project coordinator: Ing. Marian Moronescu
Enlargement manure buffalo
Enlargement manure buffalo, Transylvania Dairy
Project Manager: Ing. Dan Munteanu
Vertical systematization ruts perimeter
Vertical systematization ruts perimeter, SC Transilvania Dairy LLC
Project Manager: Ing. Dan Munteanu
Complex housing Halber
Complex 39 turnkey apartments, commercial space 350 mp, basement 300 mp, parking 1500 mp.
Personal home, Selimbar
Project execution began in the 4 august 2014. In October 2014 has been completed the execution phase "the red" and have started the work of finishing the interior. In parallel were carried out the electrical installations, thermal and sanitary, thermo and application of decorative plaster on the outside, all of the teams XUX Investment. In the time of 6 march 2014, XUX Investment has provided logistical support for the transport and mounting position of the furniture and electrical household appliances.
Flooring rubber + polyurethane
Flooring of heavy traffic, rubber, maintenance and coating with wear layer polyurethane to the floors and walls of the airport "Henri Coanda International Airport" Otopeni, Bucharest.
Flooring industrial
Flooring industrial finished.Benefits to the casting floor finished: - don't create weaknesses, because the resistance in the plate - - - it is the same on all points fixed to the surface of the - reduced consumption of adhesives required for installation ceramic and parquet - the support layer and the flooring are a whole - resistance and maximum durability
Business center Sibiu
Subcontracting CONA. Finished 3 floors: tiles, tile, ceilings, plasterboard walls, skim, washable. Year: 2013
Loasir Avrig
Wooden holiday house, 120 mp, fireplace, backyard barbecue, oven, ler, cooker.
Project Manager: Ing. Dan Munteanu
Street lighting LED
Execution insulated foundations, metal poles, frame panels and lamps, 280 pieces, including fitting. Locality: Toplita
Personal home- Cernea Ciprian
Construction personal home basement + ground floor + attic, 277 mp, to red with thermal installations, plumbing, electric, the board finished. Execution time 5 months.
The private residence at the red, Selimbar
Construction house type duplex, ground floor + floor, to red with thermal installations, plumbing, at the level of the drawn pipes and boards elicopterizate, plus leveling the yard with the earth existing. The surface: 345 mp. The duration of the execution: 5 months The town: Selimbar